The 24 month retainer cost UK businesses face looks expensive next to a single fixed price quote. A retainer is a number you pay every month, forever, while a project is one total with an end date. But an app does not stop costing money the day it launches, so comparing a retainer with the build price alone is comparing two different things. In this guide we put three routes on the same two year timeline, a fixed project with pay as you go support, a fixed project followed by a retainer, and a retainer from day one, and show where the money goes phase by phase. Every figure is an illustrative scenario built from the ranges we publish elsewhere, not a quote and not market data.
24 month retainer cost UK: the short answer
Over two years, a retainer usually costs a little more in cash than a fixed price project with ad hoc support, and buys noticeably more useful work. In our worked example the gap is about £5,000 to £10,000 on a total of roughly £100,000. The fixed route only stays cheaper if the app barely changes after launch.
That is the whole argument in one paragraph. The rest of this post shows the working, so you can swap in your own numbers. If you have not yet decided which model suits your stage at all, start with our guide to project vs retainer for UK SMEs, which covers the decision itself. This post assumes you are weighing the two and want to see the money.
The example app and the assumptions
The scenario is a mid complexity booking app for a UK SME: iOS and Android, customer accounts, card payments, notifications and a simple admin panel. In our UK app cost index, apps like this sit in the £40,000 to £120,000 band, so we priced the build at £60,000, towards the lower end of where established SMEs usually land.
The other assumptions, all illustrative:
- A blended team rate of £550 a day, inside the £400 to £700 range we see for senior UK developers. Our guide to UK app development hourly rates explains the spread.
- Maintenance in the region of 15 to 20 percent of the build cost a year, the rule of thumb we use when budgeting a live app.
- Two foreseeable change requests in the first two years, priced inside our published feature ranges.
- Running costs such as hosting, store accounts and third party services are the same in every route, so we leave them out of the comparison. Budget for them separately, including Apple’s yearly developer membership.
Prices exclude VAT. Your own numbers will differ, and that is the point of showing the model rather than a single headline figure.
Three routes over 24 months
Route A: fixed project, then pay as you go. The studio builds the agreed scope for a fixed £60,000 over five months. After launch, you call someone in when something breaks or a new feature is needed. Over the remaining 19 months that means two rounds of yearly iOS and Android update work (6 days each), about a day a month of fixes and security patches, and two change requests quoted as small projects at £6,000 and £9,000. Because nobody is working on the code continuously, each call out also starts with time spent getting back into it. We allowed eight of those at a day each.
Route B: fixed project, then a retainer. Same £60,000 build over five months. From month six, a retainer of four days a month, £2,200, covers maintenance, updates, fixes and the two change requests from the same pool of time.
Route C: retainer from day one. No fixed price. The team works on a larger retainer of 18 days a month, £9,900, while it builds, and the product takes shape as you review it. Because scope is decided along the way, the build usually runs longer and includes extra iteration, so we assumed seven months instead of five. After launch the retainer drops to four days a month, £2,200.
Phase by phase spend
| Phase | Route A: fixed then ad hoc | Route B: fixed then retainer | Route C: retainer throughout |
|---|---|---|---|
| Months 1 to 6 | £60,550 | £62,200 | £59,400 |
| Months 7 to 12 | £7,700 | £13,200 | £20,900 |
| Months 13 to 18 | £10,950 | £13,200 | £13,200 |
| Months 19 to 24 | £17,250 | £13,200 | £13,200 |
| 24 month total | £96,450 | £101,800 | £106,700 |
| App live from | Month 6 | Month 6 | Month 8 |
Two things stand out. Route A is cheapest in total, but its spend is lumpy, rising in the second year as change requests and the second round of updates land on top of each other. Routes B and C are flat after launch, which is easier to budget for and easier to defend to a finance director.
What the totals hide
The headline totals are close. What they buy is not. In Route A, eight of the days you pay for after launch are spent getting a developer back up to speed rather than improving the app. Counting only productive days after launch, the picture changes.
| After launch | Route A | Route B | Route C |
|---|---|---|---|
| Spend after launch | £36,450 | £41,800 | £37,400 |
| Productive days | 58 | 76 | 68 |
| Cost per productive day | about £628 | £550 | £550 |
Route B costs £5,350 more than Route A over two years, and buys 18 more productive days, worth roughly £9,900 at the same rate. Route C costs the most and launches two months later, but the product you launch has been shaped by more rounds of review. Whether that is worth it depends on how certain you were about the scope in the first place, which is the same question we unpacked in fixed scope vs time and materials.
Hidden costs over two years
The model above is kind to Route A, because it assumes everything goes to plan. Over 24 months, these are the costs that rarely appear on either quote.
Change requests priced at a premium. In a fixed project, every change after sign off is a new negotiation, and small changes are priced as small projects with their own overhead. A retainer absorbs most of them into the monthly pool. If you expect your app to evolve, our guide to managing scope creep on an app project is worth reading before you sign anything.
Waiting for a free slot. Pay as you go support only works if the team is available when you call. A bug that sits for two weeks because the original developers are busy costs you bookings and reviews, which no line on an invoice captures.
Lost knowledge. The people who built the app move on. Each new developer pays a learning tax on your code, and you pay for it.
Unused retainer days. The mirror risk. A retainer sized for a busy month and paid in quiet months is money spent on nothing. Ask whether unused time rolls over, and for how long.
Renewal terms and notice periods. A retainer is a long contract in practice. Check how rates are reviewed each year, how much notice you need to give, and that you own the code and every account from day one. We covered the clauses in contract clauses founders should negotiate.
How sensitive the 24 month total is
Small changes in assumptions flip the answer, which is why a single headline figure is never enough. If the app needs no change requests at all, Route A drops to £81,450, well below both retainer routes, and pay as you go is clearly right. If instead a third feature of £9,000 arrives in year two, Route A rises to £105,450 and becomes more expensive than Route B, without the extra productive days.
The practical test is simple. Write down every change you can already foresee in the next two years. If the list is short and modest, a fixed project and ad hoc support will usually win on the 24 month retainer cost in the UK. If the list is long, or you already know users will push you in directions you cannot predict, a retainer after launch is usually the better value, even if the cash total is slightly higher.
Build your own two year comparison
You do not need our numbers to run this exercise. You need five inputs, and most of them are already in the quotes on your desk.
- The build price, or for a retainer from day one, the monthly fee multiplied by the realistic build length. Ask the studio how many months they expect, then add one.
- A yearly maintenance allowance. If nobody has given you one, 15 to 20 percent of the build cost is a sensible starting point.
- The change requests you can already see coming, priced against published feature ranges such as our breakdown of the cost to add subscription billing and its sister posts.
- A re-briefing allowance for any pay as you go route: a day or so each time a developer has to pick the code back up.
- The retainer size after launch, and what happens to unused days.
Put those on a simple spreadsheet with 24 columns, one per month, and total each route. Then add one more row underneath: productive days delivered. The cheapest total and the best value are often two different columns, and seeing both side by side is what turns a gut feeling into a decision you can explain to a business partner or a bank.
What to do next
Ask any studio you are talking to, us included, to price your app on a 24 month timeline rather than as a single build figure, and to show the maintenance and change request assumptions behind it. That one request makes quotes comparable and exposes the cheap build that becomes an expensive two years.
Sandra has spent many years in app development across design and product, and we are happy to model the 24 month retainer cost UK teams would face for your app, with every assumption written down. Send us a project brief or book a free 30 minute call, and we will walk you through the numbers for each route.